Tinsel
Project

Stop losing projects you should've won.

Scope of work

Tinsel sits on top of all your lead sources including Dodge, ConstructConnect, Deltek, public bid boards, and permit data. We read the plans and specs behind every project. What comes back isn't a possible list of leads. It's a qualified opportunity with the product, the spec, and the quantity already attached.

A row of tower cranes over a large construction site against a clear sky
Every one of these has a plan set. The opportunity is inside it.

Reading the documents, not searching them

A-101
Schedule 1 — Document findings and disposition
What the document says What it actually means Disposition
"Existing rooftop units to remain" The product is already in the building. Nobody is buying another one. Reject
"Free of mars and scratches" A finish tolerance, not a competitor named Mars. Brand names that double as ordinary words — Delta, Apollo, Viking, Champion, Standard — make keyword search approximate in nearly every category. Reject
JOC catalog line @ $0.00 Job-order-contract catalogs list every product in the book next to every line item, whether or not the project involves it. Reject
"4,500 LF of 8-inch HDPE water main" Quantity, material and size. Non-metallic pipe also implies tracer wire, warning tape, connectors, test stations and ground rods — none of them named. Capture

A keyword search sends all four to your rep. We qualify it like your best sales rep would.

General notes
  1. Which product, what spec, how many

    There's a lot of opportunity, and without estimating quantity and product it's impossible to prioritize effectively. The $100MM project that specified $10k of your products is a lot less valuable than the $25MM project that specifies $100k of your products. Linear feet for wire, pipe and tape. Each for fixtures, heads and hydrants. Square feet for roofing and glazing. Tons and quantities for equipment.

  2. What the plans imply but never name

    Plans specify a system, not every component it needs. Non-metallic pipe means tracer wire, warning tape, connectors, test stations and ground rods. A roof assembly implies fasteners and edge metal. A door schedule implies hardware sets. Search for your product name and you miss everything else you manufacture.

  3. Mentioned, or actually in the schedule

    Being named in a CSI document and being in the equipment schedule are vastly different signals. We measure mentions and specs separately.

  4. Tuned against what actually closed

    Every change we make to the filters is replayed over deals that already closed, to check we never dropped a lead that turned into a quote. Precision nobody measures against outcomes is just a claim.

Detail 1 — what the rep receives
Report page listing recommended products with quantity, confidence level and links to the plan pages each is based on
Seven pages, not eight hundred — p.2 of 7, every row cites its source. Nobody has to open the plan set.

Where the projects come from

A-102
Schedule 2 — Source index
SourceDescription
Feeds we build on Dodge and ConstructConnect, plus national commercial feeds, public bid boards and permit data. If you already subscribe, Tinsel reads what you're already paying for.
Captured ourselves We're working our way through more than 6,000 agency portals across all 50 states — cities, counties, school districts, state DOTs — each one verified against the agency's own .gov site, and the list keeps growing.
Documents, not listings A project record with no plans attached can't be qualified, sized or specified. Getting the documents is most of the work, and it's the part we don't skip.

Three decisions this changes

A-103
Your data, on top of the market's
1

Which regions to defend

You find out you're losing a region on specifications while there's still time to fight to win the business. Mention share and spec share, by your sales territories and US metro areas.

Detail 2 — one zone against the national average
Line chart of market share over a year in one sales zone, showing a competitor overtaking your brand while the national average holds flat
One zone against the national average — a competitor takes the lead in January
2

Which reps to back and which to replace

Qualified projects per rep's coverage area, read out of the plans, sitting next to what actually shipped there out of your ERP and CRM. A rep holding a potentially rich territory on thin revenue gets highlighted.

Detail 3 — demand against revenue, by market area
Map of the southern United States with market areas shaded by whether revenue keeps up with demand, and a panel showing one metro's orders, qualified projects and market share
Share of demand against share of revenue — red is a market buying more than it buys from you
3

Whether any of it paid

Every lead tracked from delivered to opened to quoted to shipped, attributed back to the project that produced it. No mystery about who got the lead (always sent to the sales person or rep who owns the territory) and what happened to it.

Detail 4 — lead through to the order it produced
ProjectSales managerTrackingActionsQuotes
Cypress Grove Town Center — anchor repositioning Rep A opened, dashboard viewed, plan downloaded Rep A (Aug 15): Contacted repRep A (Aug 18): Created quoteRep A (Sep 02): Already in talks with owner 28022472Ordered: 28022472
Northview Middle School replacement Rep B opened, dashboard viewed Rep B (Aug 20): Created quoteRep B (Aug 27): Met with specifierRep B (Sep 04): Bid date confirmed 28022613
Chandler Public Library expansion Rep C opened, plan downloaded Rep C (Aug 27): Forwarded to distributorRep C (Sep 03): Created quoteRep C (Sep 09): Created quote 2802274428022751
Regional Airport — Terminal B modernization Rep D opened, dashboard viewed, plan downloaded Rep D (Sep 03): Contacted repRep D (Sep 05): Requested takeoffRep D (Sep 12): Created quoteRep D (Sep 19): Submitted budget number 28022810Ordered: 28022810
Revision 1 — customer note
△ 1
My team could only use construction project data to hunt and peck with keyword searches for our name and our competitors' names. With Tinsel, we finally saw the full picture: the projects we were missing, the relationships that weren't delivering, and exactly where we were underperforming. Within 48 hours, we made the call to switch rep firms in a key region.
ByCEO, $100M category-leading manufacturer
CategoryAir movement
OutcomeRep firm changed

Bring one category. We'll read a week of it.

We'll show you what your current process is sending your reps, and what it's leaving on the table.

Book a walkthrough
Drawn byTinsel
ScaleNTS
Date2026
SheetT-900
Projecttinselsearch.com